The building’s reconstruction would be top to bottom including a new roof, walls and flooring. We began with demolition on the interior walls (block CMU walls), which was followed by removal and…
Read More
The building’s reconstruction would be top to bottom including a new roof, walls and flooring. We began with demolition on the interior walls (block CMU walls), which was followed by removal and…